Needful material before CNC tube drilling machine installation

Supertime delivers CNC tube drilling machine to users’ plant, and provides complete foundation drawing, prepare foundation according to this drawing.

Foundation is a very important part for stable machine running, because it will influence the machine processing stability, reliability and accuracy.

Generally, the concrete solidification period is 29 days under normal temperature. After foundation solidification, Supertime arranges professional engineers for machine installing and commissioning.

CNC beam drilling machine installation