Installation,training and commissioning of CNC plate drilling machine

1.Foundation to prepare

Machine base, including cable channel. Embedded anchor bolts should be leveling, and to ensure a watered concrete has fully hardened.

2.Body hoisting

Equipment is assembled in supplier’s workshop, after testing and technical inspection, then is dismantled and transported to customer’s plant. Before arrival install pins in installation position.

CNC plate drilling machine

3.Body leveling

When worktable is ready, weld well the 12 front regulating plates and bottom anchor plates, then regulate 36 adjusting bolts, leveling the frame and side part.

4.Electrical connection and commissioning

Details can refer to manual.